Ayesa

Highway México Tuxpan Nuevo Necaxa-Tihuatlán

States of Puebla and Veracruz. Mexico [MX]

This project will connect the coast of the Gulf of Mexico to Mexico City, which is the most efficient connection between the high plateau (altiplano) and the port of Tuxpan (State of Veracruz), one of the most important in the country, a major trade hub with USA and Canada.

Divisions

Services

See project

RLP-26 – New unit for the treatment of refinery effluents

Lima [PE]

The project consists in the construction of a new biological treatment unit as a final stage of the current treatment. The objective is to adapt the industrial dumping to the legal specifications of the new Supreme Decree of the Government of Peru (037-2008-PCM).

Divisions

Services

See project

Bioethanol pilor plant

Villarejo de Orbigo (León) [ES]

The objective of the process plant is to obtain ethanol (bio ethanol) through the fermentation of raw materials of agricultural origin such as beetroot, cereal and other sources of sugar like Jerusalem artichoke or chicory, and purify it until an adequate quality for future dehydration is reached, in order to use it as automotive fuel.

Divisions

Services

See project

Asistencia técnica para el control de la operación y el mantenimiento de la Línea 1 de Metro de Sevilla

Seville [ES]

La Línea 1 del Metro de Sevilla supone la primera de las cuatro líneas que constituirán el sistema de Metro de Sevilla y su área metropolitana.

El contrato radica en 3 vertientes diferentes: operación de la línea, mantenimiento de instalaciones fijas y material móvil, y análisis de demanda y tráfico de viajeros.

Divisions

Services

See project

Proyecto de instalaciones ferroviarias entre las estaciones de Atocha y Chamartín

Madrid [ES]

La construcción de este nuevo túnel ferroviario en doble vía que conecta los principales corredores españoles de alta velocidad entre las estaciones de Atocha y Chamartín, mejorará significativamente la calidad del servicio y comodidad de los usuarios, ayudando a descongestionar la ciudad de Madrid.

Divisions

Services

See project

PTAR de Atotonilco

Atotonilco [MX]

Ayesa has got the contract for supervision, engineering, commissioning work of a sewage treatment plant of Atotonilco, north of Mexico City. This contract will be implemented over the next four years.


Divisions

Services

See project

Executive project of Dam The Zapotillo

Gonzalez Gallo Yahualica, Jalisco [MX]

Ayesa has been hired to do the executive project and the resident engineering for the construction of the Dam The Zapotillo, the largest so far designed by our company.

Divisions

Services

See project

Emergency management system of provincial councilof Seville (Sigrid)

Seville [ES]

The Provincial Service of Fire Prevention and Extinction of the province of Seville (SEPEI) has adopted an effective tool for real-time adequate management of all resources available to respond to any fire emergency, rescue, flood, rescues, etc. Is integrated with the Provincial Government of Seville and local entities with which there exists an agreement for cooperation in this matter.

Divisions

     

Services

See project